- Home
- Jobs
- Supply Chain
- Sourcing Manager- Construction Material, Principal

Sourcing Manager- Construction Material, Principal at Hut 8
Miami, FLFull-timeSupply ChainPosted 6 days ago
Apply with PipelineAbout the Role
<div class="content-intro"><p> </p>
<p> </p></div><p><strong><span data-contrast="auto"><span data-ccp-parastyle="heading 2">ABOUT THE ROLE</span></span></strong><span data-ccp-props="{"134245418":true,"335559738":280,"335559739":100}"> </span></p>
<p><span data-contrast="auto">Every data center Hut 8 builds depends on a particular list of materials that are expensive, commodity driven, and critical to get on time. This Sourcing Manager owns those categories. </span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">The Sourcing Manager works cross-functionally with Engineering, Construction, Finance/AP, Legal, and Operations to protect project schedules and minimize material supply risk across capital projects.</span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">Some of the responsibilities you can expect include the following:</span><span data-ccp-props="{}"> </span></p>
<ul>
<li data-leveltext="•" data-font="" data-listid="2" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Own sourcing strategies for specialty construction materials including MV and LV cables, conduit, grounding systems, fiber, , and electrical distribution equipment across the full site supply chain. </span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="2" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="2" data-aria-level="1"><span data-contrast="auto">Lead RFQs and technical and commercial bid evaluations with Engineering, including approved manufacturers and approved equals</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="2" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="3" data-aria-level="1"><span data-contrast="auto">Negotiate supply and frame agreements, including copper and aluminum price adjusters, tariff fluctuation strategies lead time commitments, and warranty terms</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="2" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="4" data-aria-level="1"><span data-contrast="auto">Secure manufacturing slots for long lead equipment and track production against project schedules, identifying early risk indicators such as capacity constraints or sub-supplier delays</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="2" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="5" data-aria-level="1"><span data-contrast="auto">Qualify and dual source critical suppliers so no single manufacturer can stop a project</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="2" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="6" data-aria-level="1"><span data-contrast="auto">Partner with the procure-to-pay team so awarded agreements translate into accurate purchase orders, on time delivery, and payments aligned with contractual milestones</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="2" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="7" data-aria-level="1"><span data-contrast="auto">Report category spend, savings, and supply risk, and recommend improvements that reduce risk and improve cash flow timing</span><span data-ccp-props="{}"> </span></li>
</ul>
<p><strong><span data-contrast="auto"><span data-ccp-parastyle="heading 2">ABOUT YOU</span></span></strong><span data-ccp-props="{"134245418":true,"335559738":280,"335559739":100}"> </span></p>
<ul>
<li data-leveltext="•" data-font="" data-listid="4" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="8" data-aria-level="1"><span data-contrast="auto">Bachelor's degree in supply chain, Business, Engineering, or related field preferred (equivalent experience considered)</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="4" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="9" data-aria-level="1"><span data-contrast="auto">5+ years of experience in strategic sourcing or procurement of electrical materials and equipment for capital projects</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="4" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="10" data-aria-level="1"><span data-contrast="auto">Demonstrated experience negotiating supply agreements with manufacturers and distributors, including metal price adjustment terms</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="4" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="11" data-aria-level="1"><span data-contrast="auto">Comfortable reading single line diagrams, cable schedules, and equipment specifications at a commercial level</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="4" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="12" data-aria-level="1"><span data-contrast="auto">Track record of managing long-leaded equipment and supplier capacity constraints</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="4" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="13" data-aria-level="1"><span data-contrast="auto">Comfortable working in a fast-paced, evolving infrastructure or industrial environment</span><span data-ccp-props="{}"> </span></li>
</ul>
<ul>
<li data-leveltext="•" data-font="" data-listid="4" data-list-defn-props="{"335552541":1,"335559685":720,"335559991":360,"469769242":[8226],"469777803":"left","469777804":"•","469777815":"hybridMultilevel"}" data-aria-posinset="14" data-aria-level="1"><span data-contrast="auto">Preferred: Data center, utility, or mission critical project experience; experience with ERP systems (SAP, Oracle, Coupa, Odoo)</span><span data-ccp-props="{}"> </span></li>
</ul>
<p><strong><span data-contrast="auto"><span data-ccp-parastyle="heading 2">ABOUT THE WORK ENVIRONMENT</span></span></strong><span data-ccp-props="{"134245418":true,"335559738":280,"335559739":100}"> </span></p>
<p><span data-contrast="auto">This role is in office at our corporate headquarters in the Brickell area of Miami, Florida. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.</span></p>
Related Roles
Construction Sourcing Manager, Principal
Hut 8
Miami, FLLogistics & Expediting Manager
Hut 8
Miami, FLSupply Chain Engineering, Principal
Hut 8
Miami, FLSupply Chain Engineering (Mandarin Speaker), Principal
Hut 8
Miami, FLField Manager, CXQC, Principal
Hut 8
Corpus Christi, TexasDigital Operations Engineer
Hut 8
Miami, FL